Case Study

  • 1 mile of prefabricated stainless steel pipework
  • 8 tonnes of steelwork pipe supports
  • 4 x 7 metre long, 1.2 metre wide combined flue stacks
  • 90 % of pipework fabricated off-site
fabrication

Key Facts

Project Title:
Pontyclun: STOR
Location:
South Wales
Value:
£805,000
Duration:
20 weeks (8 weeks prefabricating, 12 weeks on-site installing)
G&H divisions:
Fabrication