Case Study
- 1 mile of prefabricated stainless steel pipework
- 8 tonnes of steelwork pipe supports
- 4 x 7 metre long, 1.2 metre wide combined flue stacks
- 90 % of pipework fabricated off-site
Key Facts
- Project Title:
- Pontyclun: STOR
- Location:
- South Wales
- Value:
- £805,000
- Duration:
- 20 weeks (8 weeks prefabricating, 12 weeks on-site installing)
- G&H divisions:
- Fabrication