Case Study
- 2 miles of prefabricated stainless steel pipework
- 9 metre long pipe bridge fabricated offsite
- 90 % of the scheme was fabricated offsite
- 8 weeks to install
- Rooftop and subterranean working in a live hospital environment
Key Facts
- Project Title:
- Clatterbridge Hospital Cancer Centre CHP
- Location:
- Wirral
- Value:
- £480,000
- Duration:
- 12 weeks (four weeks prefab, eight weeks installation onsite)
- G&H divisions:
- Fabrication