Case Study
- Full fabrication and electrical process engineering
- M&E pre-designed to reduce on-site works
- Prefabricated gas, steam and LTHW off-site
- Delivery connection and on-site testing
- Defect-free installation
Key Facts
- Project Title:
- Müller (Market Drayton)
- Client:
- Müller
- Services:
- Engineering Services
- Value:
- £600,000
- Duration:
- 17 weeks
- G&H divisions:
- Fabrication
Find out more information about this project
Download Case Study