Case Study

  • Full fabrication and electrical process engineering
  • M&E pre-designed to reduce on-site works
  • Prefabricated gas, steam and LTHW off-site
  • Delivery connection and on-site testing
  • Defect-free installation
fabrication

Key Facts

Project Title:
Müller (Market Drayton)
Client:
Müller
Services:
Engineering Services
Value:
£600,000
Duration:
17 weeks
G&H divisions:
Fabrication

Find out more information about this project

Download Case Study